Chapter 12.03 WASTEWATER SERVICES
This chapter is included in your selections.
Sections:
- 12.03.010 Permits required – Application requirements.
- 12.03.020 Installation of separate service to each house or premises.
- 12.03.030 Installation of service pipes.
- 12.03.040 Backwater prevention.
- 12.03.060 Temporary disconnection – Charges.
- 12.03.070 System under exclusive control of city engineer – Damage responsibility.
- 12.03.080 Access to premises for inspection.
- 12.03.090 Services outside of city.
- 12.03.100 Billing, due dates, delinquencies and liens.
- 12.03.110 Adjustments and refunds.
- 12.03.120 Wastewater service charges.
- 12.03.130 Lateral service and trunk line costs.
- 12.03.140 Industrial waste and pretreatment charges.
- 12.03.150 Unlawful discharge.
- 12.03.160 On-site disposal.
- 12.03.170 Installation required.
- 12.03.180 Use of existing building wastewater services.
- 12.03.190 Discharge of stormwater.
- 12.03.200 Prohibited discharge.
- 12.03.210 City’s authority.
- 12.03.220 Interceptors.
- 12.03.230 Special agreements.
- 12.03.240 Plan approval.
- 12.03.250 Flow measurement and sampling facilities.
- 12.03.260 Waste charges.
- 12.03.270 Inspection.
- 12.03.280 Bod computation.
- 12.03.290 Measurement and sampling devices.
- 12.03.300 Connection of private systems.
- 12.03.310 Dumping into wastewater system – Supervision required – Regulations generally.
- 12.03.320 Permission required for dumping.
- 12.03.330 Dumping charges.
Legislative History: Ord. 1917 (2006), Ord. 1956 (2008)