Skip to main content
Loading…
This section is included in your selections.

Decision Criteria for townhouse projects for residential use with 4 or more townhouses in the R-2, R-3, and C-1 Zones:

A. Compliance with Townhouse Standards: The proposed townhouse project complies with the townhouse standards in HRMC 17.19, the requirements of the applicable zone and other applicable requirements of this Title.

B. Grading: Any grading, contouring, on-site surface drainage, and/or construction of on-site surface water storage facilities shall be in accordance with Section 4.3 Grading and Erosion Control of the City’s adopted Engineering Standards. Graded areas shall be replanted as soon as possible after construction to prevent erosion.

C. Transportation Circulation and Access Management: The application is in compliance with the applicable requirements of Chapter 17.20 including provision of a Traffic Impact Analysis or a Transportation Assessment Letter pursuant to Section 17.20.060 unless waived by the City Engineer.

D. Storage: All outdoor storage areas and garbage collection areas shall be screened through the use of vegetative materials or appropriate fencing.