Skip to main content
Loading…
This section is included in your selections.

A. Pending the adoption of a permanent service charge schedule, an interim service charge is adopted to assist in funding the stormwater system pending the completion and adoption of a stormwater rate study. The study will be completed within 18 months of the implementation of the interim fee schedule. No refunds or credits will be made if the final service charge adopted is greater than the interim service charge.

B. The interim service charge is as follows:

Water Meter Size, inches

Monthly Interim Rate, $

3/4

2.50

1

12.00

1 1/4

21.00

1 1/2

23.00

2

40.00

3

80.00

4 and over

125.00